
You will need: a hex wrench “6”, heads “12”, “13”, “14”, a small chisel, a hammer
Drain the cooling system

The gaps between the rocker arms and valves are adjusted on a cold engine, with the cylinder head fastening nuts and the nuts fastening the racks of the rocker arm axles are tightened to the required torque
- Removal and installation of the cylinder head ZMZ-406
- Removal and installation of chain tensioners ZMZ-409
- Removal and installation of the ZMZ-402 engine distributor
- Replacing the camshafts of the ZMZ-406 engine
- Installation of injection pump for diesel D-245
- How to adjust the K-151 carburetor
- How to remove and install the cylinder head ZMZ - 402