The engine management system controls the injection and ignition timing of the engine based on the readings of the ECM sensors
Auxiliary units: generator, water pump, power steering pump and air conditioning compressor of the 2GR-FE engine are driven by a V-ribbed belt
Removable anti-roll bar parts for replacement when wear occurs
The gearbox converts the torque transmitted from the engine in magnitude and direction
In the article, we will consider disassembly, assembly and verification of generator parts
We remove the generator from the car, as described in the previous article
The car engine won't start for the following reasons:
- - start system not working;
Installing the intake camshaft of the front head of the block Installing the intake camshaft of the front head of the engine block 1AZ-FE
Apply a coat of engine oil to the end thrust surfaces of the camshaft
The main criterion for the health of the engine power system is the fuel pressure in the fuel rail
We remove the electric fans of the radiator of the engine cooling system for repair or replacement
We prepare the car and install it on a lift or a viewing ditch
Removing the front wheel brake pads
When replacing brake pads, always change the inner pads, outer pads and pad covers as a set
Preparing the car for the task
Drain the brake fluid.